SOU1RCE 1 Engineering — Civil · Structural · Electrical — BESS · SCADA + Security · Substation
8 disciplines, one platform
Eurocode + AISC design codes covered
DXF + IFC 4 fabrication-ready output
See a real output — 24m×36m portal frame warehouse →
What FrameAI Delivers

From PDF to fabrication-ready artefacts

Upload a structural steel PDF. FrameAI extracts every member, runs the Eurocode calculations, and outputs the full suite of fabrication-ready files.

DXF Shop Drawings
Part marks, dimensions, and material callouts. AutoCAD R12 compatible for every steel detailer.
IFC 4 BIM Model
Full structural model importable into Tekla, Robot, SCIA, and any BIM platform.
DSTV NC1 CNC Data
7th edition ASCII output for automated drilling, cutting, and welding machines.
Eurocode Calcs
EN 1993-1-1 buckling, EN 1993-1-8 connections, EN 1994 composite beams — included.

Project Examples

Real structural steel projects — each with full Eurocode calculations, shop drawings, DSTV NC1, DXF BIM model, and fabrication PDF ready to download.

EC
Eurocode Library 10 Worked Examples

Live calculations, step-by-step derivations, downloadable PDFs. EN 1993-1-8, EN 1992, EN 1995, EN 1998.

10 Examples
EN Standards
Live Calc
Industrial Portal Frame — 36m Span
Portal / Frame Industrial Portal Frame — 36m Span

Single-storey industrial portal frame, 36m span × 12m eave height. Haunched eaves moment connections, HEA 300 columns on pinned base plates. Wind zone C per EN 1991-1-4 with internal pressure ±0.2. Snow 1.2 kN/m² per EN 1991-1-3. Execution class EXC 2.

36m span Primary
HEA 300 Section
S355 Steel
4 Artefacts
Bolted Extended End-Plate Moment Connection
Connections Bolted Extended End-Plate Moment Connection

Extended 8-bolt 4-row end-plate connection for HEA 280 beam-to-column moment frame. Column web stiffeners required at tension zone. 8×M24 10.9 preload, Class 4 category per EN 1993-1-8 Table 3.1. Designed for M_Ed = 180 kNm.

8 bolts Primary
4-row Section
S355 Steel
4 Artefacts
Warehouse Bracing System — X-Braced Frames
Portal / Frame Warehouse Bracing System — X-Braced Frames

Three X-braced frames in a 48m × 24m warehouse building. HEA 200 columns and rafters with cross-bracing in both directions. Seismic design per EN 1998-1 for zone 2 (ag=0.25g). Brace forces governed by seismic load combination.

3 bays Primary
48×24m Section
S275 Steel
3 Artefacts
Seismic-Designed Moment Frame — 5-Storey
Portal / Frame Seismic-Designed Moment Frame — 5-Storey

Five-storey moment-resisting frame designed for high-seismicity region. HEA 340 sections with capacity design per EN 1998-1 §5.2. Column overstrength factor Ω=0.75. Strong-column weak-beam verification. Ductility class DCM, behaviour factor q=4.0.

5 storeys Primary
HEA 340 Section
S355 Steel
3 Artefacts
Office Floor — Composite Slab with Secondary Beams
Composite / Floor Office Floor — Composite Slab with Secondary Beams

Multi-storey office floor with IPE 360 secondary beams at 3m centres supporting a 130mm composite slab (ComFlor 60). Headed stud connectors at 150mm spacing, full shear interaction. Fire rating R90 per EN 1994-1-2. 36 beams total across 3 floors.

36 beams Primary
3 floors Section
S355 Steel
3 Artefacts
Timber-Steel Hybrid Roof — Purlins on Ridge Beam
Timber / Hybrid Timber-Steel Hybrid Roof — Purlins on Ridge Beam

Sawtooth roof with GL 24h glulam purlins at 1.2m spacing on a primary S355 IPE 240 ridge beam. Span 18m. Cold-formed Z-section secondary purlins in S350GD. EN 1995-1-1 timber design with k_h modification factor for edge beams.

18m span Primary
GL 24h Section
S355+S350 Steel
2 Artefacts
Crane Runway Beam — Web Stiffeners + Monorail
Industrial / Crane Crane Runway Beam — Web Stiffeners + Monorail

Ergonomic overhead crane runway beam, HEA 500 with welded web stiffeners at 600mm intervals. Monorail hoist capacity 10t, repeated fatigue loading. EN 1993-1-1 Class 1 plastic, EN 1993-1-9 fatigue assessment for FAT 80 category. Wheel patch loads from GB1b crane group.

15m span Primary
HEA 500 Section
S355 Steel
2 Artefacts
Bridge Cross-Girder Connection Detail
Bridges / Connections Bridge Cross-Girder Connection Detail

Cross-girder to main girder bolted connection detail for a road bridge. HEB 600 cross-girders welded to 50mm thick sole plate on main IPE 800. 10×M36 10.9 preloaded bolts in shear, EN 1993-1-8 Category B preloaded connections. Execution class EXC 3.

10 bolts Primary
HEB 600 Section
S460M Steel
2 Artefacts
Multi-Bay Industrial Shed — 4×18m Portal
Portal / Frame Multi-Bay Industrial Shed — 4×18m Portal

4-bay portal frame industrial shed, each bay 18m span × 7.5m eaves. HEA 320 columns on pinned base plates, IPE 450 rafters with haunched eaves connections. 5 column lines on a 72m grid. Purlins SHS 120×120×6. Wind zone B per EN 1991-1-4. EN 1993-1-1 §6.3 buckling check per column line.

4 bays Primary
72m total Section
S355 Steel
4 Artefacts
Warehouse Truss Roof — Warren Truss 24m, 7 Panels
Truss / Roof Warehouse Truss Roof — Warren Truss 24m, 7 Panels

Warren truss roof spanning 24m at 6m centres. CHS 114×6 top and bottom chords, CHS 76×5 diagonals, 7 panels. Pin connections at all nodes using gusset plates. EN 1993-1-1 §6.2.4 compression + §6.2.3 tension check on every member. Chord ratio 79.4% critical.

24m span Primary
7 panels Section
S355 Steel
4 Artefacts
Braced Office Bay — X-Brace Vertical Bracing 6×6m
Portal / Frame Braced Office Bay — X-Brace Vertical Bracing 6×6m

Vertical X-brace bay in a 6-storey office building. HEA 200 boundary columns, IPE 240 horizontal beams, CHS 76×5 cross braces. Pin-ended brace members with slotted end plates. Notional horizontal load case EN 1993-1-1 §5.3.2. §6.2.4 compression check governs at 88.2%.

6×6m bay Primary
CHS 76×5 Section
S355 Steel
3 Artefacts
RC Beam — EN 1992-1-1 Bending + Shear (Worked Example)
Concrete / RC RC Beam — EN 1992-1-1 Bending + Shear (Worked Example)

Simply-supported rectangular RC beam, 300×600mm, 6m span. C30/37 concrete, 3Ø20 B500B tension bars. Bending check per EN 1992-1-1 §6.1 (rectangular stress block, x/d limit 0.45), shear check §6.2.2 V_Rd,c, crack width §7.3 under quasi-permanent load (w_k = 0.24mm < 0.3mm XC2), minimum reinforcement §9.2.1.1. Rebar schedule with BS 8666 shape codes.

300×600mm Primary
C30/37 Section
B500B Steel
2 Artefacts
RC Flat Slab — EN 1992-1-1 Shear + Crack Width (Worked Example)
Concrete / RC RC Flat Slab — EN 1992-1-1 Shear + Crack Width (Worked Example)

Two-way flat slab, 200mm thickness, C25/30, Ø12-150 B500B top and bottom. Shear check per EN 1992-1-1 §6.2.2 (V_Rd,c without links), crack width §7.3 under quasi-permanent load (w_k = 0.21mm < 0.3mm XC1), minimum slab reinforcement §9.3.1.1. Secondary reinforcement ≥ 20% of main. Rebar schedule per BS 8666.

200mm slab Primary
C25/30 Section
B500B Steel
2 Artefacts
Portal Frame — 24m × 36m Warehouse
Portal / Frame Portal Frame — 24m × 36m Warehouse

A 24m span, 36m long single-storey portal frame warehouse. Haunched eaves connections, pinned base plates, tapered haunch plates at the ridge. Wind zone B per EN 1991-1-4.

24m span Primary
36m long Section
S355 Steel
4 Artefacts
IPE 240 Beam Array — 8 Beams, Simple Span
Simple Beams IPE 240 Beam Array — 8 Beams, Simple Span

Eight IPE 240 simply-supported beams at 6m spacing in a primary frame. Full depth end plates, 2×M20 10.9 bolts per connection. EN 1993-1-1 Class 1 plastic analysis.

8 beams Primary
6m span Section
S275 Steel
4 Artefacts
IPE 400 Secondary Beams — Floor Grid 9×12m
Composite / Floor IPE 400 Secondary Beams — Floor Grid 9×12m

Nine IPE 400 secondary beams in a 9×12m composite floor grid. Headed stud connectors at 150mm spacing, profiled metal deck (ComFlor 60). EN 1994-1-1 composite beam design.

9 beams Primary
12m span Section
S355 Steel
4 Artefacts
Bolted Shear Connections — 12 Connections
Connections Bolted Shear Connections — 12 Connections

Twelve bolted shear connections for a primary-secondary beam frame. M20 8.8 bolts in bearing, 6mm fillet welds, web doubler plates at 4 connections. EN 1993-1-8 §3.13.

12 joints Primary
M20 8.8 Section
S275 Steel
4 Artefacts
Moment Connections — 6 Extended End-Plate
Connections Moment Connections — 6 Extended End-Plate

Six extended end-plate moment connections for a 3-bay frame. 8×M24 10.9 bolts in 4-row configuration, Class 4 category per EN 1993-1-8 Table 3.1. Column web stiffeners required.

6 joints Primary
8×M24 10.9 Section
S355 Steel
4 Artefacts
Column Base Plates — 6 No. M24 Anchor Bolts
Base Plates Column Base Plates — 6 No. M24 Anchor Bolts

Six HEA 240 column base plates with 4×M24 cast-in anchor bolts. Grouted with non-shrink grout. EN 1993-1-8 §6.2.5 T-stub in tension + base plate in compression. Concrete grade C30/37.

6 plates Primary
4×M24 anchors Section
S355 Steel
4 Artefacts
Industrial Frame — 3-Bay, 18m Each
Portal / Frame Industrial Frame — 3-Bay, 18m Each

A 3-bay, 54m long industrial frame with 18m spans. Cranked haunch connections at interior columns, X-bracing in side walls. Snow load 1.5 kN/m² per EN 1991-1-3. Seismic zone 2 per NTC 2018.

3 bays Primary
18m each Section
S355 Steel
4 Artefacts
Truss Roof System — 48m Span, 6m Spacing
Truss / Roof Truss Roof System — 48m Span, 6m Spacing

A Vierendeel truss roof system spanning 48m at 6m centres. Circular hollow sections (CHS) 114×6mm in chords, 76×5mm in diagonals. Splices at every third node. EN 1993-1-1 §5.9 buckling curves.

48m span Primary
6m centres Section
S355 Steel
4 Artefacts

These outputs are representative — upload your own drawing to generate real artefacts.

Try it free →