Civil Sample Outputs

Real BBS PDFs. Real cut-lists.
No placeholder data.

Three worked RC examples with actual FrameAI Civil outputs — bar bending schedules, cut-list Excel, and EN 1992 calc notes. Download and inspect before uploading your own PDF.

⬇ All downloads are real files generated by the civil pipeline · No signup required
EN 1992-1-1 · BS 8666 · Beams + Columns

RC Frame — 4-Storey Office

4-storey RC office frame, 1,200m² footprint — beams, columns, and slabs from a single PDF.

~18.6 t Reinforcement
14 marks Bar marks
Manual: ~6 hours · FrameAI: 4 minutes
RC frame EN 1992-1-1 4-storey Beams + Columns
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →
EN 1992-1-1 · BS 8666 · Mesh + Edge Bars

Ground Slab — 800m² Industrial Floor

800m² industrial ground bearing slab — A393 mesh, edge reinforcement, crack control joints.

~6.0 t Reinforcement
8 marks Bar marks
Manual: ~3 hours · FrameAI: 2 minutes
Ground slab EN 1992-1-1 Industrial A393 mesh
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →
EN 1992-1-1 §9.6 · EN 1997 · Stem + Base

Cantilever Retaining Wall — 4m High

4m high cantilever retaining wall — stem tension reinforcement, base slab heel/toe bars, kicker detail.

~2.7 t Reinforcement
10 marks Bar marks
Manual: ~4 hours · FrameAI: 3 minutes
Retaining wall EN 1992-1-1 §9.6 EN 1997 4m height
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →
EN 1992-1-1 §6.2/§7.4 · BS 8666 · Continuous Beams

RC Beam Schedule — 2-Storey Portal Frame

2-storey RC portal frame — continuous floor beams with zone reinforcement (support/midspan/support), shear links, EC2 shear + deflection checks.

~4.2 t Reinforcement
6 beam types Bar marks
Manual: ~5 hours · FrameAI: 3 minutes
RC beam EN 1992-1-1 2-storey Continuous beams BS 8666
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →
EN 1992-1-1 §5.8/§6.1 · BS 8666 · Biaxial Bending + Second-Order Effects

RC Column Schedule — 6-Storey Residential Block

6-storey residential RC frame — column schedule with EN 1992-1-1 §5.8.8 nominal curvature second-order moments + §6.1 biaxial bending M-N interaction checks.

~7.4 t Reinforcement
3 column types Bar marks
Manual: ~5 hours · FrameAI: 3 minutes
RC column EN 1992-1-1 §5.8 Biaxial bending Second-order effects BS 8666
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →
EN 1992-1-1 §6.4/§9.8 · BS 8666 · Punching Shear + Bending

RC Pad Footing Schedule — 6-Column Office Frame

6-column RC office frame — isolated pad footings under 300×300 columns, 800 kN axial load, 150 kPa allowable bearing, C30/37 concrete.

~3.8 t Reinforcement
2 footing types, 6 off total Bar marks
Manual: ~4 hours · FrameAI: 3 minutes
RC footing EN 1992-1-1 §6.4 Punching shear EN 1997-1 BS 8666
BBS PDF Cut-list .xlsx EN 1992 calc note
View sample →

Upload your own RC drawing PDF

Upload any RC drawing set. FrameAI Civil extracts the rebar schedule, runs EN 1992 checks,
and produces a fabrication-ready BBS PDF + cut-list Excel in under 5 minutes.

Upload PDF → /civil/upload
Free tier: 3 projects · Pro: unlimited · No credit card for free tier