Drop your PDF. Get DXF, DSTV NC1, IFC 4, and BOM in minutes — while you sleep.
Real structural steel projects from Japan, China, and India — processed through the full FrameAI EN 1993 pipeline with downloadable fabrication artefacts.
PDF to fabrication-ready in 6 minutes. EN 1993-1-1 checks on 18 members, EN 1993-1-8 eaves connections (8 × M20 10.9), DSTV NC1 7th edition. IPE 500 columns, IPE 450 rafters, S355 J2, 12.4 te total steel. JIS B 0001 / EN 1090-2 traceability.
PDF to fabrication-ready in 11 minutes. EN 1994-1-1 composite beam checks, EN 1993-1-1 frame analysis, connection design (endplate + shear tabs), DSTV NC1 7th edition. 2 400 te structural steel across 3 phases.
PDF to fabrication-ready in 22 minutes. IS 800:2007 / EN 1993-1-1 dual-code design, seismic base shear per IS 1893:2016, 48 primary members, 16 bolted moment connections, DSTV NC1 7th edition.
Process your own steel drawing to generate real fabrication artefacts.
Try it free →