EN 1993-1-1 · EN 1994-1-1 · Excel BOM
Mixed steel/composite slab office building. Composite beams with full-interaction stud checks to EN 1994-1-1 §6.6. Multi-grade BOM, DSTV NC1 per part mark, IFC 4 BIM model.
All artifacts generated by the FrameAI pipeline from a single input PDF. No login required. Files are being generated — check back shortly or run your own in the live demo.
Three-story office floor plan with column grid and loading notes.
EC3 member checks + EC4 composite beam stud utilisation per span.
Floor-by-floor shop drawings with composite beam stud layouts.
NC1 per part mark — beams, columns, bracing per grade S275/S355.
Full 3-story IFC4 model including composite deck notation.
EN 10365 unit weights, surface area, subtotals by grade.
Member sizes, connection types, total tonnage, and calc time.
Upload any structural steel PDF. FrameAI extracts members, runs Eurocode checks, and outputs a full fabrication pack — automatically.