Enter your detailer cost and project volume. Get the exact EUR savings, payback period in days, and a permanent shareable link — forward it to your CFO or project manager.
One message. Includes the permanent link + a one-pager you can forward to your CFO.
Net savings = (hours saved × hourly rate) − plan cost.
Hourly rate = (fully-loaded cost + Tekla seat) ÷ 1,600 productive hours/yr.
| Variable | Formula | Source |
|---|---|---|
| Hourly rate | (Detailer cost + Tekla seat) ÷ 1,600 h/yr | Your inputs |
| Manual hours/yr | projects × autom% × hours/project | Your inputs |
| FrameAI hours/yr | eligible × (hours ÷ 15 + 0.5h review) | Case studies |
| Hours saved | manual hours − FrameAI hours | — |
| Gross savings | hours saved × hourly rate | — |
| Net savings | gross savings − plan cost/yr | Pricing |
| Payback (days) | plan cost ÷ (gross savings ÷ 365) | — |
Speedup factor: 15× (conservative portal frame baseline). Actual range:
| Project type | Speedup | Benchmark |
|---|---|---|
| Portal frames | 15× | 11h → 4min |
| Bolted connections | 22× | Moment connection |
| Trusses | 14× | Warehouse bracing |
| Multi-storey | 18× | 5-storey seismic |