Two-tier protective device coordination for a 11 kV/0.4 kV substation transformer (1250 kVA, 6% Z) with LV main circuit breaker and downstream MCCB. Define selective coordination per IEC 60947-2: select instantaneous and short-time delay settings for the main breaker, verify coordination with LV upstream breaker, and confirm 50% selectivity margin for the downstream device.

IEC 60947-2 / IEC 60255-151 · IEC 60947-2, IEC 60255-151, IEC 60364-4-47
Input parameters
Transformer 1250 kVA, 11/0.4 kV, Z% = 6%
LV main breaker 1600 A air circuit breaker
Downstream MCCB 630 A, electronic release
Isc LV side (Icc) 15.8 kA (prospective)
Inom transformer 1804 A (LV side)
Protection standard IEC 60947-2 / IEC 60255-151
Selectivity margin 50% (per IEC 60364-4-47)
Run your own version of this calc →
RESULT IEC 60947-2 / IEC 60255-151
Governing check MCCB instantaneous setting
Result value 560 A
Utilization
PASS
All checks
Check Status Util. Value
Main breaker — instantaneous PASS
I_i = 6 × Inom = 9600 A (6–12× range)
Main breaker — short delay PASS
I_sd = 3 × Inom = 5412 A, t_sd = 0.3 s
MCCB — long time setting PASS
I_r = 560 A (0.9 × Inom_mccb)
MCCB — instantaneous PASS
I_i = 5 × I_r = 2800 A
Selectivity — main vs upstream PASS
ΔI_sel = 4200 A > 50% margin ✓
Time-current margin PASS
t_margin = 180 ms ≥ 100 ms minimum
standard IEC 60947-2, IEC 60255-151, IEC 60364-4-47
method Two-tier coordination — time-current discrimination
partialFactors Safety margin ≥ 50% per IEC 60364-4-47
Compute time 0.6 s