AISC 360-22 Case Study · Chicago IL

4-Story Composite Office, Chicago — 480-Ton Steel Package

AISC 360-22 §I3.2 · 3 ksi composite slab · 192 shear studs

4-Story Composite Office, Chicago — 480-Ton Steel Package
480 tons
Steel tonnage
24 members
Members
16 connections
Connections
8 min
FrameAI runtime
Composite beam AISC 360-22 §I3.2 Shear studs ASCE 7-22 US steel Office

Project summary

AISC 360-22 · A992 Gr.50 W-shapes · A572-50 plate · AISC §I3.2 composite

Mark Section Qty Material Notes
CB01–CB16 W21×44 16 pcs A992 Gr.50 Composite beam, §I3.2
C01–C08 W14×120 8 pcs A992 Gr.50 Column, §E3 flexural buckling
BP1–BP8 PL 1/2×18×24″ 8 pcs A572-50 Base plate

Composite beam design — AISC 360-22 §I3.2

Section W21×44
Slab 5″ NW at 3 ksi
Stud size ¾″ dia × 3″ long
Stud grade A108 (per §I8)
Total studs 192 studs (12/beam)
Spacing 24″ on center
Max utilisation 81% (§I3.2)
Deflection L/360 ✓
Studs per beam 12 studs/beam × 16 beams
Concrete strength f′c = 3 ksi NW
Slab depth 5 in. normal weight

Column design

AISC 360-22 §E3 (compression) + §F2 (flexure) + §B4.1 compact classification

Member Section Check Code ref Utilisation Result
C01–C08 W14×120 Compression §E3 AISC 360-22 §E3
78%
✓ PASS
C01–C08 W14×120 Flexure §F2 AISC 360-22 §F2
41%
✓ PASS
C01–C08 W14×120 N+M §H1-1a AISC 360-22 §H1
78%
✓ PASS

Connection details

AISC 360-22 §J2 (welds) · §J3 (bolts) · AISC RCSC 2020

Type Bolt grade Dia Qty/conn Shear Code ref
Shear tab (beam–column) A325-N 3/4″ 4 Vu = 28 kips AISC 360-22 §J3
Base plate (anchor rods) F1554 Gr.36 1-1/4″ 8 4 per column AISC DG-1 §3.3

Design loads — ASCE 7-22

Chicago IL · LRFD load combinations §2.3

Parameter Value Reference
Ground snow pg 25 psf ASCE 7-22 Fig. 7.2-1 — Chicago, Zone C
Roof snow ps 38 psf §7.3 sloped roof factor Cs
Basic wind V 105 mph ASCE 7-22 Fig. 26.5-1B, Exposure B urban
Seismic SDS 0.15g Chicago Fig. 22-2, SDC B

Member utilisation — AISC 360-22

Composite beams §I3.2 · Columns §E3/§F2 · LRFD §B3.1 · max governing: 81%

Member Section Check Code ref Utilisation Result
CB01 W21×44 §I3.2 composite AISC 360-22 §I3.2
81%
✓ PASS
CB01 W21×44 Deflection L/360 AISC 360-22 §L3
72%
✓ PASS
CB02 W21×44 §I3.2 composite AISC 360-22 §I3.2
79%
✓ PASS
CB03 W21×44 §I3.2 composite AISC 360-22 §I3.2
77%
✓ PASS

Time & cost comparison

Manual EOR time ~55 hrs
Rate $120/hr
Manual cost $6,600
FrameAI runtime 8 min
Engineer QA 0.5 hr
FrameAI cost ~$72
Saved on this job $6,528
Annual (12 projects) $78,336

Bolt schedule

AISC RCSC 2020 · Installation per RCSC §8.2 · AISC 360-22 §J3

Connection Grade Diameter Qty/conn Total bolts Install torque
Shear Tab (J2) A325-N 3/4″ 4 64 315 ft-lb
Base Plate (BP1) F1554 Gr.36 1-1/4″ 8 64 900 ft-lb

Download the artifact bundle

Shop drawings, connection report, DSTV NC1, BOM Excel — for this 480-ton composite office project.

No signup · Instant delivery

Project info

Code AISC 360-22 §I3.2
Tonnage 480 tons
Members 24 members
Shear studs 192 studs
Connections 16 connections
AI runtime 8 min
Manual time ~55 hrs
Saved per job $6,528

Run on your drawings

Upload a steel PDF. FrameAI extracts members, runs AISC 360-22 checks, and delivers composite beam design, shop drawings, connection reports, BOM, DSTV NC1, and IFC4.

Start free →

Free tier · No credit card

Download artifact bundle

Enter your email to receive the fabrication package for this project — instant delivery.